Social Platform for Pro Athletes: QA From the First Requirement
Challenge:
A VC-backed startup was building a social network for professional athletes with a team of 30+ people. The product spanned three web portals, for business partners, athletes, and fans, plus native Android and iOS apps for fans. With investor-driven pressure to move fast, the team wanted QA involved from the first requirement document instead of added after problems reached production.
Solution:
We joined at the planning stage as the team's QA function, reviewing requirement documents before development started on each feature. Catching gaps and ambiguities on paper prevented defects that would otherwise have surfaced later, and kept engineering shipping planned features on schedule. From there we built out coverage across all three web portals and both mobile apps, running structured regression cycles ahead of every release.
Results:
- +Requirement-stage reviews caught gaps before development started, cutting late-stage rework
- +Planned features shipped on schedule release after release
- +Regression coverage in place across 3 web portals and 2 native mobile apps
- +QA embedded from week one instead of bolted on after launch